          JB180 Hydraulic Walking Piling Rig

          Short Description:

          JB series Hydraulic Walking Piling Rig is famous design for highly integration of electric, hydraulic and mechanic piling rig. It owns completely the Independent Property Rights and has been awarded certificates from Chinese government due to its advanced technology. The rig provides excellent performance, reliable working, is widely used in SMW method (Soil Mixing Wall method). The rig can be attached with diesel pile hammer, pre-bored pre-cast piling equipment, etc. It is suitable for various piling and foundation conditions, such as, elevated highways, expressways, bridges, ports, water docks, metro stations and skyscrapers.


        1. FOB Price: US $0.5 - 9,999,999 / Piece
        2. Min. Order Quantity: 1 Piece/Pieces
        3. Supply Ability: 100 Piece/Pieces per Month
        4. Port: Shanghai Port
        5. Payment Terms: L/C, D/A, D/P, T/T
        6. Product Detail

          Product Tags

          Product Features
          HYDRAULIC WALKING PILING RIG
          1. MORE EFFECTIVE, STABLE AND DURABLE
          The leader, main platform and walking gear are designed for heavy-duty pile driving,?to ensure more stable and effective work.
          Weight carrier of bigger load bearing.

          2. EASY FOR ASSEMBLY AND TRANSPORATION
          Modular structure design, easy for assembly and disassembly.
          Out triggers of the platform with the rotary pin structure, is driven by cylinder, which?saves trouble of disassembly. Can be disassembled and transported by parts, easy for
          transportation.

          3. ADVANCED ELECTRO-HYDRAULIC CONTROL SYSTEM AND TECHNOLOGY
          Both main drum and auxiliary drum are under electro-hydraulic proportional control,?available for variable speed control and lock any speed.
          Main pump, control valve, pressure gauge, drums are all using domestic and foreign?well-known brands.

          4. PRACTICAL AND RELIABLE OPERATION MONITORING SYSTEM
          Standard leader with goniometer and inductive load angle monitor (optional) provide instant information about batter piling and pulling force, set alarm while in danger. The previous functions can be achieved while the piling rig working with ZLD series agitating auger and sensors (optional).
          Deep mixing pile monitor (optional) provides data of pile depth, piling speed, the amount of slurry, and output of the information.

          5. COMFORTABLE OPERATION CAB FOR EASY CONTROL
          Well insulated operator’s room with five wind shields assures bright, quiet environment with minimum fatigue.
          Hydraulic actuated winch control levers allow well performance and easy control.
          Space for drill control box, inductive load angle monitor (optional), deep mixing monitor (optional) is reserved in the operator’s room, make the single-driver control easy and reliable.

          TECHNICAL PERFORMANCE CHARACTERISTICS OF JB180
          1. JB180 leader can be extended up to 60m, together with ZLD series agitating auger, it can drill holes of depth up to 53m, which is the best choice for deep foundation reinforcement and soft soil conditions.
          2. Weight carrier of bigger load bearing, suitable for long Auger and vibration impact hammer, conducting large - depth filling pile operations.
          3. JB180 contains 8 lifting cylinders, increase site adaptability.
          4. Unique positioning structure design guarantees a self-erect without help of service crane. JB180 can make 60m height.
          5. JB180 was granted complete intellectual property rights and 6 patents, including 3 patents for invention and 3 patents for utility.
          6. Customizable large operator room of JB180 can install air condition (optional),
          more humanization configuration.

          Product Model: JB180
          Specifications

          Item JB180 HydraulicWalking Piling Rig
          Total length of leader (m) 21~60
          Diameter of leader (mm) ?1220
          Center distance between leader and mounted equipment (mm) 600×?102
          Leader inclination angle (left to right) (°) ±1.5
          Backstay stroke (mm) 3400
          Leader trimming cylinder stroke (mm) 400
          Max. auger model ZLD220/85-3-M2-CS
          Max. diesel hammer model D180
          Max. leader length (m) 60
          Max. pulling force (with Max. leader) (KN) 800
          Hydraulic winch (for mounting auger, diesel hammer) Pulling force of single rope (KN) 100max
          Winding and rewinding peed (m/min) 0~21
          Rope diameter (mm) ?22
          Drum capacity (m) 835
          Hydraulic winch (for uplift, drilling pipe, pile) Pulling force of single rope (KN) 110max
          Winding and rewinding peed (m/min) 0~20
          Rope diameter (mm) ?22
          Drum capacity (m) 300
          Swing angle (°) ±10
          Transverse travel Travel speed (m/min) ≤3.4
          Travel step (mm) 3100
          Vertical travel Travel speed (m/min) ≤ 1.3
          Travel step (mm) 800
          Uplift of the track Speed (m/min) ≤ 0.44
          Height (mm) 500
          Distance between tracks Working (mm) 9400
          Travelling (mm) 6000
          Distance between pulleys in track Working (mm) 6000
          Travelling (mm) 5000
          Transverse-moving track Length (mm) 10800
          Width (mm) 1800/1200
          Vertical-moving track Length (mm) 6900
          Width (mm) 1700
          Connection between outrigger beam and platform Pin rotary, cylinder expanding
          Average ground pressure (MPA) ≤0.1
          Motor power (kw) 45
          Hydraulic crowded system (MPA) 25/20
          Hydraulic crowded system operation Manual & electric control
          Total weight of piling rig (T) ≈195

          Note: Specifications are subjected to change without prior notice.

          Application

          BEILUN NINGBO PORT PROJECT? ?Product: Diesel Pile Hammer & JB180 / THE GATE OF THE ORIENT, SUZHOU? ? Product: ZLD220 & JB180 / GUANGZHOU METRO PROJECT? ? ?Product: ZLD330&JB180

          JB180 Hydraulic Walking Piling Rig3

          Service
          1. FREE-CALL CENTER SERVICE
          We provide free-call center service for 24hours. For further information of SEMW products or after-sale service, please call us at+0086-21-4008881749. We will provide information or solutions you need.

          2. CONSULTANCY & SOLUTIONS
          Our professional team offers free consulting services according to different job sites, soil conditions and your requirements.

          3. TESTING & TRAINING
          SEMW is committed to free guidance of installation and testing, to make sure that you can make proper operations.
          We will offer training on site if it is necessary, to make sure you know the correct?way for maintenance, analysis and debugging of the malfunctions.

          4. MAINTENANCE & REPAIR
          We have offices in many places in China, easy for maintenance.
          Sufficient supplies for spare parts and wearing parts.
          Our service team has a wide range of professional experience on any size project?large or small. They provide best solutions with quick response.

          5. CUSTOMERS & CONNECTIONS
          After-sale customer file was set up for better understanding your need and feedback.
          More services are provided, such as, sending info of new released products, latest?technology. We also provide special offer for you.

          THE GLOBAL MARKETING NETWORK
          Diesel Hammers are the key product of SEMW. They have achieved a good reputation domestically and overseas. SEMW diesel hammers are exported in a large quantity to Europe, Russia, Southeast Asia, North America, South America, and Africa.


        7. Previous:
        8. Next:

        9. Related Products

          色丁狠狠桃花久久综合网,狠狠色丁婷婷日日,亚洲爱婷婷色婷婷五月,激情综合激情五月俺也去